Subway Formosa Boulevard Station

Name of building
Subway Formosa Boulevard Station 
Construction year
2008 
Structural system
Transmitted flat trusses 
Primary use
 
Architect
Shin Takamatsu 
Architect2
 
Structural engineer
 
Constructor
 
Professional
 
Country
TAIWAN 
Address
Jhongshan 1st Rd/Jhongjheng 3rd and 4th Rd,Xinxing Dist,Kaohsiung 
Means of transportation
Subway R10/05 Formosa Boulevard Statioid on Red Line/Orange Line. 
Admission
Outside:OK Inside:OK 
Reference
 
Note
4 concouse roofs and the Dome of Light in the center. 
« Previous Page