Kao-Ping Hsi Bridge

Name of building
Kao-Ping Hsi Bridge 
Construction year
2000 
Structural system
Bridge 
Primary use
 
Architect
Fritsch,Chiari & Partner GmbH 
Architect2
 
Structural engineer
Chinese Engineering Consultants Pan Asia-Taisei-Kawada-Ratio JV(construction) 
Constructor
 
Professional
 
Country
TAIWAN 
Address
Expressway-3,Da Pingding,Dashu-xing, Kaohsiung/Jiouru-xiang,Pingtung 
Means of transportation
Kaohsiung Bus from east-side of Kaohsiung Railway Station to Cishan or Meinong. get off at Foguangshan Temple.walk 2km to north on the bus route.every 60-90 min.60 min ride. 
Admission
Outside :OK Inside :-- 
Reference
 
Note
Structural system: bridge,cable Cable-Stayed Bridge [Date shot:2006.11] 
« Previous Page