Tropical Conservatory of Beijing Botanical Garden

Name of building
Tropical Conservatory of Beijing Botanical Garden 
Construction year
1999 
Structural system
Space trusses 
Primary use
 
Architect
Beijing Institute. of Architectural. Co. 
Architect2
 
Structural engineer
Beijing Institute. of Architectural. Co. + King Glass Engineering Co. 
Constructor
 
Professional
 
Country
CHINA 
Address
Xiangshan Lu, Haidian Dist, Beijing 
Means of transportation
25km north-west from subway Xizhimen Station (Lines 2&13).bus 634 from Xizhimenwaijie Road (the west side of subway Xizhimen Station on Line 2 and 13) to Xiangshan Gongyuan Dongmen. get off at Beijing Zhiwuyuan. in front. every 10 munutes. 60 minutes rides. the fare is double of the first fare. 
Admission
Outside : OK Inside : OK summer 6:00-19:00 winter 7:00-17:00 open all the year 
Reference
Journal of IASS, Vol. 151 (Aug 2006), pp.192-193. 
Note
TEL : 010-8259-8771 / 6259-1561. www.beijingbg.com 
« Previous Page