Max-Eyth Steg

Name of building
Max-Eyth Steg 
Construction year
1989 
Structural system
Cable 
Primary use
Pedestrian Bridge 
Architect
 
Architect2
 
Structural engineer
Schlaich Bergermann & Partner 
Constructor
 
Professional
 
Country
GERMANY 
Address
Freiberg/Max-Eyth-See, Stuttgart 
Means of transportation
walking 600m north from Max-Eyth Steg on U-14 from stuttgart Haupt-Bahnhof. 
Admission
Outside : OK Inside : 
Reference
The Art of Structural Engineering, by Alan Holgate,Ed.Axel Menges,1997, pp208-213. 
Note
Structural system: Tensile, Cable 
« Previous Page